Key Features
- Premium composite deck
- Hidden fixings for a screw-free surface
- Zero annual maintenance required
- Matching fascia boards for a clean finish
Materials
Composite Decking
Project Details
- Completed
- 2023
- Build Duration
- 2 weeks
- Location
- Hove
Gallery
Our Approach
Integrated LED deck lights were recessed into the step risers and perimeter, providing subtle wayfinding illumination that makes the space usable well into the evening. A small planting strip was retained along the rear boundary to soften the transition to the fence and introduce some greenery — low-maintenance evergreen grasses and ferns that need almost no attention.